Research & Analysis · 2027 Budget Snapshot

Chicago Department of Transportation – BGA Policy 2027 Budget Snapshot

By Geoffrey CubbageOctober 28, 2026
$2B
2027 proposed appropriations
$1,997,393,291 total
+8.7%
Appropriation change
+$159,870,728 from 2026
1,500
Budgeted positions & FTEs
Up 12 positions, or +0.8%

One of the city’s largest departmental budgets, but also a heavily grant-funded one, much of CDOT’s operations are self-funding or funded independently of the rest of the city budget. The department is responsible for the city’s roads, bridges, lighting, and underground infrastructure coordination. 

Chicago Department of Transportation Snapshot: Appropriation & Staffing Changes from 2026 Budget

Chicago Department of Transportation Snapshot: Appropriation & Staffing Changes from 2026 BudgetAppropriations and positions/FTEs comparison. Missing values are shown as dashes.Measure2026 Budgeted2027 ProposedNet ChangePercent ChangeAverage AnnualRate (2011–2026)Inflation-adjustedRate (2011–2026)Appropriations$1,837,522,563$1,997,393,291+$159,870,7288.7%10.0%7.3%Positions & FTEs1,4881,500+120.8%3.1%NA{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"summary","title":"Chicago Department of Transportation Snapshot: Appropriation & Staffing Changes from 2026 Budget","source":"Source: City of Chicago budget APIs. Both rates are arithmetic averages of year-to-year percentage changes over 2011–2026. Inflation-adjusted appropriations use supplied 2025-dollar factors through 2025; later years retain nominal values (factor 1), matching the supplied spreadsheet. Both rates require every year and nonzero annual baselines. Proposed 2027 is excluded.","warning":"","edited":false,"data":{"previousYear":2026,"currentYear":2027,"rateStartYear":2011,"rateEndYear":2026,"inflationYear":2025,"rows":[{"id":"appropriations","label":"Appropriations","previous":1837522563,"current":1997393291,"averageRatePct":10.019035501784083,"inflationRatePct":7.339421347358692,"net":159870728,"percent":0.08700340949228388},{"id":"positions","label":"Positions & FTEs","previous":1487.535096153846,"current":1499.535096153846,"averageRatePct":3.0919677511201114,"inflationRatePct":null,"net":12,"percent":0.008067036556668185}]}} Download data (CSV)

Departmental Highlights

  • CDOT is only 12.4% locally-funded, with more than half of its budget coming from federal grants and roughly another quarter from state grants.
  • Construction of buildings and structures, CDOT’s largest appropriations category, is up $154.6 million from the previous year’s budget, a 22.7% increase. Outside contracting through the professional and technical services appropriation is also up $2.6 million, or 2.5%. 
  • A new $3.825 million appropriation from the EPA’s Diesel Emission Reduction Act federal grant is one of the department’s largest single-line increases, listed as being for “Purposes as Specified” with no further information in the budget book or grants supplement. 

Historical Context

CDOT’s total appropriations have been growing rapidly in recent years, driven by substantial increases in state and federal grants as well as revenues from the vehicle and motor fuel funds. 

From 2011-2026, CDOT’s budget grew at an average rate of 10% annually, or 7.3% when adjusted for inflation through 2025, compared to a citywide average rate of 5.5% (inflation-adjusted 3.2%). The current proposal would continue the trend of rapid growth, increasing the department’s appropriations by 8.7% from the previous year.

Chicago Department of Transportation Appropriations and Inflation-adjusted Appropriations (2025 dollars)

Chicago Department of Transportation appropriations from 2011 through the proposed 2027 budget, nominal dollarsAnnual appropriations for Chicago Department of Transportation from 2011 through 2027 proposed. Every year has a plotted value.$0M$510M$1020M$1530M$2040M2011 $637,825,658 Chicago Dept of Transportation · $637,825,65820112012 $636,610,958 Chicago Dept of Transportation · $636,610,95820122013 $642,799,621 Chicago Dept of Transportation · $642,799,62120132014 $673,245,833 Chicago Dept of Transportation · $673,245,83320142015 $598,286,083 Chicago Dept of Transportation · $598,286,08320152016 $581,356,067 Cdot · $581,356,06720162017 $621,377,879 Cdot · $621,377,87920172018 $459,129,158 Cdot · $459,129,15820182019 $543,060,487 Cdot · $543,060,48720192020 $467,971,706 Cdot · $467,971,70620202021 $770,356,074 Cdot · $770,356,07420212022 $1,276,497,782 Cdot · $1,276,497,78220222023 $1,399,244,996 Chicago Department of Transportation · $1,399,244,99620232024 $1,484,552,843 Chicago Department of Transportation · $1,484,552,84320242025 $2,039,303,751 Chicago Department of Transportation · $2,039,303,75120252026 $1,837,522,563 Chicago Department of Transportation · $1,837,522,56320262027 · Proposed $1,997,393,291 Chicago Department of Transportation · $1,997,393,2912027$1,997.39M{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"appropriations","title":"Chicago Department of Transportation Appropriations and Inflation-adjusted Appropriations (2025 dollars)","source":"Source: City of Chicago Budget Ordinance appropriations datasets, 2011–2026, and 2027 Budget Recommendations — Appropriations Years without a row for the selected department are left blank rather than estimated.","warning":"","edited":false,"priceBasis":"nominal","dollarBaseYear":null,"missingInflationFactorYears":[]}

Values in nominal dollars.

Download data (CSV)

Estimated Fringe Costs

City budgets do not break out “fringe” pension and benefit costs for non-grant positions by department, instead grouping them together as citywide expenses under the Finance General section of the budget. To better reflect the real cost of service for departmental operations, BGA Policy has included an estimate of pension and benefit costs for the years 2018-2026, using Department of Finance fringe memos from each relevant year. An estimated fringe cost for the 2027 proposal uses the average annual rate of increase for each of the inputs into the fringe formulae. 

Based on the city’s fringe formulae, the CDOT fringe cost for nongrant employees averaged 6.4% from 2018-2026, compared to a citywide average of 26.8%. (Departments with a larger proportion of their budget dedicated to non-employee costs or with a larger proportion of grant-funded employees tend to have lower fringe costs, as their pension/benefit costs are either already factored into grant funds or are a smaller percentage of the overall departmental budget.)

Chicago Department of Transportation Appropriations with Estimated Fringe Cost of Pensions and Benefits for Budgeted Non-grant Positions, 2018–2027 (proposed)

Chicago Department of Transportation Appropriations with Estimated Fringe Cost of Pensions and Benefits for Budgeted Non-grant Positions, 2018–2027 (proposed)Departmental appropriations plus calculated full-time fringe and estimated part-time fringe from the supplied CSV. Missing years remain gaps.$0M$530M$1060M$1590M$2120M$496.33M2018 $496,332,633 Departmental budget with estimated fringe: $496,332,633 Departmental appropriations: $459,129,158 Calculated full-time fringe: $35,536,581 Estimated part-time fringe: $1,666,8942018$585.17M2019 $585,166,799 Departmental budget with estimated fringe: $585,166,799 Departmental appropriations: $543,060,487 Calculated full-time fringe: $40,586,178 Estimated part-time fringe: $1,520,1342019$514.36M2020 $514,361,516 Departmental budget with estimated fringe: $514,361,516 Departmental appropriations: $467,971,706 Calculated full-time fringe: $45,054,015 Estimated part-time fringe: $1,335,7952020$820.64M2021 $820,644,421 Departmental budget with estimated fringe: $820,644,421 Departmental appropriations: $770,356,074 Calculated full-time fringe: $48,946,578 Estimated part-time fringe: $1,341,7692021$1.35B2022 $1,353,556,769 Departmental budget with estimated fringe: $1,353,556,769 Departmental appropriations: $1,276,497,782 Calculated full-time fringe: $75,058,277 Estimated part-time fringe: $2,000,7102022$1.48B2023 $1,475,499,567 Departmental budget with estimated fringe: $1,475,499,567 Departmental appropriations: $1,399,244,996 Calculated full-time fringe: $73,584,994 Estimated part-time fringe: $2,669,5772023$1.56B2024 $1,560,563,835 Departmental budget with estimated fringe: $1,560,563,835 Departmental appropriations: $1,484,552,843 Calculated full-time fringe: $72,249,325 Estimated part-time fringe: $3,761,6672024$2.12B2025 $2,117,623,436 Departmental budget with estimated fringe: $2,117,623,436 Departmental appropriations: $2,039,303,751 Calculated full-time fringe: $74,873,512 Estimated part-time fringe: $3,446,1732025$1.92B2026 $1,922,874,116 Departmental budget with estimated fringe: $1,922,874,116 Departmental appropriations: $1,837,522,563 Calculated full-time fringe: $81,613,384 Estimated part-time fringe: $3,738,1692026$2.09B2027 $2,093,960,707 Departmental budget with estimated fringe: $2,093,960,707 Departmental appropriations: $1,997,393,291 Calculated full-time fringe: $92,550,549 Estimated part-time fringe: $4,016,8672027{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"estimated-fringe","title":"Chicago Department of Transportation Appropriations with Estimated Fringe Cost of Pensions and Benefits for Budgeted Non-grant Positions, 2018–2027 (proposed)","source":"Source: departmental fringe by year - master.csv. Total equals departmental appropriations plus calculated fringe for full-time positions and estimated fringe for part-time positions. Uses the supplied 2018–2027 CSV values for either budget cycle; absent department-years remain gaps. Historical names are matched by department number.","warning":"","edited":false}Departmental appropriationsCalculated full-time fringeEstimated part-time fringe Download data (CSV)

Local Fund Actual Spend

Over the past four complete budget years for which local fund actuals/encumbrances data is available, CDOT spent on average 92% of its locally funded budget, compared to the citywide average 86.6% local fund spend.

Chicago Department of Transportation Local Fund Actuals, 2022–2025

Chicago Department of Transportation local-fund actuals, 2022 through 2025Annual local-fund budget spent and unspent for Chicago Department of Transportation from 2022 through 2025. Spending includes actuals plus encumbrances. Blue Budgeted Spend is capped at 100% of the annual budget, red Overspend is stacked above it, and pale blue shows unspent budget.$0M$60M$120M$180M$240M89.4%2022 89.4% spent Cdot · $180,016,497 total spent of $201,420,782 budget Budgeted Spend: $180,016,497 Overspend: $0 $21,404,285 unspent202293.3%2023 93.3% spent Chicago Department of Transportation · $198,231,395 total spent of $212,444,996 budget Budgeted Spend: $198,231,395 Overspend: $0 $14,213,601 unspent202393.0%2024 93.0% spent Chicago Department of Transportation · $219,531,766 total spent of $236,137,055 budget Budgeted Spend: $219,531,766 Overspend: $0 $16,605,289 unspent202492.3%2025 92.3% spent Chicago Department of Transportation · $215,923,833 total spent of $233,939,231 budget Budgeted Spend: $215,923,833 Overspend: $0 $18,015,398 unspent2025Budgeted SpendUnspentOverspend{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"local-funds","title":"Chicago Department of Transportation Local Fund Actuals, 2022–2025","source":"Source: City of Chicago budget APIs for local-fund budgets and BGA actuals/encumbrances extract for spending. Spending includes actuals plus encumbrances. Budgeted Spend is capped at 100% of the local-fund budget; Overspend is shown above it in red. Unspent budget is shown in pale blue.","warning":"","edited":false} Download data (CSV)

Budgeted Positions & Vacancies

Overall, the department’s budgeted headcount grew at an average annual rate of 3.1% from 2011-2026, compared to a citywide average annual change of -0.1%. The current proposal would increase budgeted headcount by .8% from the previous year. 

Chicago Department of Transportation Budgeted Workforce, 2011–2027 (proposed)

Chicago Department of Transportation budgeted workforce from 2011 through the proposed 2027 budgetStacked annual positions, monthly positions, hourly positions, monthly FTEs, and hourly FTEs, with colored components for ordinance years and distinct gray shades for proposed years, for Chicago Department of Transportation from 2011 through 2027 proposed. Every year has a plotted value.04509001,3501,8002011 980 Chicago Dept of Transportation · budgeted positions/FTEs Annual positions: 373 Monthly positions: 69 Hourly positions: 327 Monthly FTEs: 16 Hourly FTEs: 19520112012 929 Chicago Dept of Transportation · budgeted positions/FTEs Annual positions: 348 Monthly positions: 62 Hourly positions: 318 Monthly FTEs: 16 Hourly FTEs: 18520122013 932 Chicago Dept of Transportation · budgeted positions/FTEs Annual positions: 360 Monthly positions: 62 Hourly positions: 316 Monthly FTEs: 16 Hourly FTEs: 17820132014 1,171 Chicago Dept of Transportation · budgeted positions/FTEs Annual positions: 361 Monthly positions: 75 Hourly positions: 645 Monthly FTEs: 15 Hourly FTEs: 7520142015 1,297 Chicago Dept of Transportation · budgeted positions/FTEs Annual positions: 359 Monthly positions: 93 Hourly positions: 689 Hourly FTEs: 15620152016 1,321 Cdot · budgeted positions/FTEs Annual positions: 371 Monthly positions: 92 Hourly positions: 694 Hourly FTEs: 16420162017 1,362 Cdot · budgeted positions/FTEs Annual positions: 376 Monthly positions: 95 Hourly positions: 720 Hourly FTEs: 17120172018 1,374 Cdot · budgeted positions/FTEs Annual positions: 377 Monthly positions: 95 Hourly positions: 725 Hourly FTEs: 17720182019 1,368 Cdot · budgeted positions/FTEs Annual positions: 377 Monthly positions: 95 Hourly positions: 744 Hourly FTEs: 15220192020 1,343 Cdot · budgeted positions/FTEs Annual positions: 368 Monthly positions: 93 Hourly positions: 750 Hourly FTEs: 13220202021 1,313 Cdot · budgeted positions/FTEs Annual positions: 355 Monthly positions: 93 Hourly positions: 733 Hourly FTEs: 13220212022 1,484 Cdot · budgeted positions/FTEs Annual positions: 395 Monthly positions: 93 Hourly positions: 836 Hourly FTEs: 16020222023 1,539 Chicago Department of Transportation · budgeted positions/FTEs Annual positions: 401 Monthly positions: 98 Hourly positions: 842 Hourly FTEs: 19820232024 1,591 Chicago Department of Transportation · budgeted positions/FTEs Annual positions: 406 Monthly positions: 98 Hourly positions: 841 Hourly FTEs: 24620242025 1,576 Chicago Department of Transportation · budgeted positions/FTEs Annual positions: 404 Monthly positions: 98 Hourly positions: 849 Hourly FTEs: 22520252026 1,488 Chicago Department of Transportation · budgeted positions/FTEs Annual positions: 368 Monthly positions: 99 Hourly positions: 795 Hourly FTEs: 22620262027 · Proposed 1,500 Chicago Department of Transportation · budgeted positions/FTEs Annual positions: 379 Monthly positions: 99 Hourly positions: 796 Hourly FTEs: 22620271,500{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"workforce","title":"Chicago Department of Transportation Budgeted Workforce, 2011–2027 (proposed)","source":"Source: City of Chicago Budget Ordinance positions and salaries datasets, 2011–2026, and 2027 Budget Recommendations — Positions and Salaries Years without a row for the selected department are left blank rather than estimated.","warning":"","edited":false}Annual positionsMonthly positionsHourly positionsMonthly FTEsHourly FTEsProposed year uses gray shades Download data (CSV)

From January through September of 2026, the months for which full-time position vacancy data is currently available, CDOT averaged a 10.2% vacancy rate, compared to the citywide average of 11.2%. 

Chicago Department of Transportation Full-time Vacancies, Jan-Sept 2026

Chicago Department of Transportation vacancies, January–September 2026Filled positions, persistent vacancies and nonpersistent vacancies for Chicago Department of Transportation, January–September 2026.03446881,0311,3759.0%January 2026 9.0% vacant 1,149 filled · 76 persistent vacant · 37 other vacantJan9.0%February 2026 9.0% vacant 1,148 filled · 76 persistent vacant · 38 other vacantFeb9.4%March 2026 9.4% vacant 1,144 filled · 76 persistent vacant · 42 other vacantMar9.4%April 2026 9.4% vacant 1,144 filled · 76 persistent vacant · 42 other vacantApr9.7%May 2026 9.7% vacant 1,139 filled · 76 persistent vacant · 47 other vacantMay10.2%June 2026 10.2% vacant 1,133 filled · 76 persistent vacant · 53 other vacantJun11.9%July 2026 11.9% vacant 1,112 filled · 76 persistent vacant · 74 other vacantJul12.3%August 2026 12.3% vacant 1,107 filled · 76 persistent vacant · 79 other vacantAug11.3%September 2026 11.3% vacant 1,120 filled · 76 persistent vacant · 66 other vacantSep{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"vacancies","title":"Chicago Department of Transportation Full-time Vacancies, Jan-Sept 2026","source":"Source: 2026 Vacancies Over Time - MASTER vacancies.csv. Uses 2026 budgeted annual positions and supplied January–September 2026 persistent counts; other vacancies are monthly vacancies minus persistent vacancies.","warning":"","edited":false}Filled positionsPersistent vacanciesNonpersistent vacancies Download data (CSV)

76 of the department’s budgeted full-time positions were persistent vacancies (defined as the number of positions within the same combination of title, subsection, section, division, department, and fund codes that remained vacant in all nine months of available data): 

Chicago Department of Transportation Persistent Full-time Vacancies, Jan-Sept 2026

Chicago Department of Transportation persistent vacancies by title, January–September 2026Persistent vacancy counts by title for Chicago Department of Transportation, January–September 2026.Asphalt Laborer10Asphalt Laborer 10 2 persistent vacancy identitiesConcrete Laborer10Concrete Laborer 10 2 persistent vacancy identitiesForeman of Cement Finishers6Foreman of Cement Finishers 6 1 persistent vacancy identityBridge Operator5Bridge Operator 5 1 persistent vacancy identityField Service Specialist Ii5Field Service Specialist Ii 5 1 persistent vacancy identityCivil Engineer Ii3Civil Engineer Ii 3 1 persistent vacancy identityStreet Light Repair Worker3Street Light Repair Worker 3 1 persistent vacancy identityTraffic Engineer V3Traffic Engineer V 3 2 persistent vacancy identitiesCoordinating Planner Ii2Coordinating Planner Ii 2 2 persistent vacancy identitiesAccounting Technician1Accounting Technician 1 1 persistent vacancy identityAsst Chief Engineer1Asst Chief Engineer 1 1 persistent vacancy identityBridge and Structural Iron Worker1Bridge and Structural Iron Worker 1 1 persistent vacancy identityCarpenter1Carpenter 1 1 persistent vacancy identityCivil Engineer Iii1Civil Engineer Iii 1 1 persistent vacancy identityCivil Engineer V1Civil Engineer V 1 1 persistent vacancy identityCoord of Street Permits1Coord of Street Permits 1 1 persistent vacancy identityCoord of Warehouse Operations1Coord of Warehouse Operations 1 1 persistent vacancy identityCoordinating Engineer I1Coordinating Engineer I 1 1 persistent vacancy identityDistrict Concrete Supvsr1District Concrete Supvsr 1 1 persistent vacancy identityEngineering Technician Iii1Engineering Technician Iii 1 1 persistent vacancy identityEngineering Technician Vi1Engineering Technician Vi 1 1 persistent vacancy identityField Services Dir1Field Services Dir 1 1 persistent vacancy identityForeman of Laborers1Foreman of Laborers 1 1 persistent vacancy identityForeman of Linemen1Foreman of Linemen 1 1 persistent vacancy identityForeman of Machinists1Foreman of Machinists 1 1 persistent vacancy identityForeman of Steamfitters1Foreman of Steamfitters 1 1 persistent vacancy identityForeman of Traffic Signal Repairm…1Foreman of Traffic Signal Repairmen 1 1 persistent vacancy identityGeneral Foreman of Laborers-curb …1General Foreman of Laborers-curb and Gutter 1 1 persistent vacancy identityGeneral Supt of Streets and Sanit…1General Supt of Streets and Sanitation 1 1 persistent vacancy identityHoisting Engineer1Hoisting Engineer 1 1 persistent vacancy identityLamp Maintenance Worker1Lamp Maintenance Worker 1 1 persistent vacancy identityLineman1Lineman 1 1 persistent vacancy identityMotor Truck Driver1Motor Truck Driver 1 1 persistent vacancy identityProject Dir1Project Dir 1 1 persistent vacancy identityProject Manager1Project Manager 1 1 persistent vacancy identitySign Painter1Sign Painter 1 1 persistent vacancy identityStaff Asst1Staff Asst 1 1 persistent vacancy identityTraffic Signal Repairman1Traffic Signal Repairman 1 1 persistent vacancy identity{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"persistent-vacancies","title":"Chicago Department of Transportation Persistent Full-time Vacancies, Jan-Sept 2026","source":"Source: 2026 Vacancies Over Time - Persistent Vacancies Jan-Sept.csv. Supplied January–September 2026 persistent counts, summed by job title across funds and organizational units.","warning":"","edited":false} Download data (CSV)

Budgeted Position Changes

Setting aside title changes, promotions, and similar adjustments of positions within general job categories, half of CDOT’s proposed net increase of 12 positions/FTEs comes from a net increase of six positions within Civil Engineer titles, followed by three new Field Service Director positions. 

Chicago Department of Transportation Net and Percent Position/FTE Changes, 2026 to 2027 (Proposed) Budgets

Chicago Department of Transportation net and percent position/FTE changes, 2026 to 2027 proposed budgetsChanged position/FTE titles for Chicago Department of Transportation from the 2026 baseline to the 2027 proposed budget.TITLE20262027NET%Field Service Specialist035+35—Field Service Specialist +35 0 in 2026 · 35 in 2027 · —Motor Truck Driver8099+19+23.8%Motor Truck Driver +19 80 in 2026 · 99 in 2027 · +23.8%Senior Field Service Specialist08+8—Senior Field Service Specialist +8 0 in 2026 · 8 in 2027 · —Civil Engineer IV2734+7+25.9%Civil Engineer IV +7 27 in 2026 · 34 in 2027 · +25.9%Field Service Director25+3+150.0%Field Service Director +3 2 in 2026 · 5 in 2027 · +150.0%Supervising Timekeeper - Laborer13+2+200.0%Supervising Timekeeper - Laborer +2 1 in 2026 · 3 in 2027 · +200.0%Coordinating Engineer I78+1+14.3%Coordinating Engineer I +1 7 in 2026 · 8 in 2027 · +14.3%Coordinating Planner II34+1+33.3%Coordinating Planner II +1 3 in 2026 · 4 in 2027 · +33.3%Human Resources Business Partner01+1—Human Resources Business Partner +1 0 in 2026 · 1 in 2027 · —Painter89+1+12.1%Painter +1 8 in 2026 · 9 in 2027 · +12.1%Project Manager56+1+20.0%Project Manager +1 5 in 2026 · 6 in 2027 · +20.0%Senior Administrative Assistant67+1+16.7%Senior Administrative Assistant +1 6 in 2026 · 7 in 2027 · +16.7%Administrative Assistant1817-1-5.6%Administrative Assistant -1 18 in 2026 · 17 in 2027 · -5.6%Civil Engineer III65-1-16.7%Civil Engineer III -1 6 in 2026 · 5 in 2027 · -16.7%Projects Administrator43-1-25.0%Projects Administrator -1 4 in 2026 · 3 in 2027 · -25.0%Traffic Engineer V43-1-25.0%Traffic Engineer V -1 4 in 2026 · 3 in 2027 · -25.0%Administrative Services Officer…53-2-40.0%Administrative Services Officer I -2 5 in 2026 · 3 in 2027 · -40.0%Field Service Specialist III80-8-100.0%Field Service Specialist III -8 8 in 2026 · 0 in 2027 · -100.0%Pool Motor Truck Driver127108-19-15.0%Pool Motor Truck Driver -19 127 in 2026 · 108 in 2027 · -15.0%Field Service Specialist II350-35-100.0%Field Service Specialist II -35 35 in 2026 · 0 in 2027 · -100.0%{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"position-changes","title":"Chicago Department of Transportation Net and Percent Position/FTE Changes, 2026 to 2027 (Proposed) Budgets","source":"Source: City of Chicago 2026 Budget Ordinance and 2027 Budget Recommendations positions and salaries datasets. Percent change is net change divided by 2026 positions/FTEs.","warning":"","edited":false} Download data (CSV)

Appropriations

CDOT is 12.4% locally-funded in this year’s budget proposal, down slightly from the previous year’s 13.1%. More than half of CDOT’s funding comes from federal grants, with a further 23.6% from state grants

Chicago Department of Transportation Fund Comparison, 2026–2027

Chicago Department of Transportation Fund Comparison, 2026–2027Fund comparison including budgeted and proposed amounts, net and percent changes, and each fund’s share of the proposed departmental budget.Fund2026 Budgeted2027 ProposedNet Change from2026Percent Changefrom 2026Percent of 2027RecommendedFundsFederal Grant Fund$1,038,977,000$1,144,805,000$105,828,00010.2%57.3%State Grant Fund$399,618,000$471,965,000$72,347,00018.1%23.6%Motor Fuel Tax Fund$106,669,006$113,601,703$6,932,6976.5%5.7%Vehicle Tax Fund$82,698,417$81,112,877-$1,585,540-1.9%4.1%Disaster Recovery Fund$67,104,000$68,354,000$1,250,0001.9%3.4%Local Public and Private Grant Fund$83,331,000$64,189,000-$19,142,000-23.0%3.2%Corporate Fund$50,336,068$51,943,022$1,606,9543.2%2.6%Sewer Fund$0$513,000$513,000New Fund0.0%Tax Increment FinancingAdministration Fund$415,072$483,689$68,61716.5%0.0%Grants Management Fund$426,000$426,000$00.0%0.0%COVID-19 Grant Fund$7,948,000$0-$7,948,000-100.0%0.0%{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"fund-comparison","title":"Chicago Department of Transportation Fund Comparison, 2026–2027","source":"Source: City of Chicago 2026 Budget Ordinance — Appropriations (6694-f78c) and 2027 Budget Recommendations — Appropriations (pptx-hhw3). Funds match by fund code, which is omitted from the table. Shares use all recommended funds for the selected department; rounding may prevent percentages from summing to 100%.","warning":"","edited":false,"data":{"previousYear":2026,"currentYear":2027,"rows":[{"code":"925F","label":"Federal Grant Fund","previous":1038977000,"current":1144805000,"net":105828000,"percent":0.10185788520823849,"share":0.5731495170021575},{"code":"925S","label":"State Grant Fund","previous":399618000,"current":471965000,"net":72347000,"percent":0.18104039357586496,"share":0.23629047024770447},{"code":"310","label":"Motor Fuel Tax Fund","previous":106669006,"current":113601703,"net":6932697,"percent":0.06499260900584374,"share":0.05687497976080866},{"code":"300","label":"Vehicle Tax Fund","previous":82698417,"current":81112877,"net":-1585540,"percent":-0.01917255562461371,"share":0.04060936690109269},{"code":"925D","label":"Disaster Recovery Fund","previous":67104000,"current":68354000,"net":1250000,"percent":0.018627801621363852,"share":0.03422160288011101},{"code":"925L","label":"Local Public and Private Grant Fund","previous":83331000,"current":64189000,"net":-19142000,"percent":-0.22971043189209298,"share":0.0321363851021366},{"code":"100","label":"Corporate Fund","previous":50336068,"current":51943022,"net":1606954,"percent":0.031924503916356754,"share":0.026005405261972515},{"code":"314","label":"Sewer Fund","previous":0,"current":513000,"net":513000,"percent":null,"share":0.00025683474672289765},{"code":"B21","label":"Tax Increment Financing Administration Fund","previous":415072,"current":483689,"net":68617,"percent":0.16531348778043328,"share":0.00024216012048275173},{"code":"75","label":"Grants Management Fund","previous":426000,"current":426000,"net":0,"percent":0,"share":0.0002132779768108273},{"code":"925C","label":"COVID-19 Grant Fund","previous":7948000,"current":0,"net":-7948000,"percent":-1,"share":0}],"previousTotal":1837522563,"currentTotal":1997393291,"previousSource":{"id":"6694-f78c","title":"Budget - 2026 Budget Ordinance - Appropriations","resolvedBy":"pinned"},"currentSource":{"id":"pptx-hhw3","title":"Budget - 2027 Budget Recommendations - Appropriations","resolvedBy":"pinned"}}} Download data (CSV)

Largest Appropriations

Unlike most departments, a large portion of CDOT’s budget is not directly personnel-related. The department’s single largest appropriations category is for construction of building and structures, and the department holds a very large sum of grant funds in reserve balance as well. 

Chicago Department of Transportation Top 10 Largest Appropriations, 2027 proposed

Chicago Department of Transportation top 10 largest appropriations, 2027 proposedTop 10 largest 2027 proposed appropriation accounts for Chicago Department of Transportation.CONSTRUCTION OF BUILDINGSAND STRUCTURES$835.85MCONSTRUCTION OF BUILDINGS AND STRUCTURES $835,847,807 Account 0540 · 10 source rowsRESERVE BALANCE$827.01MRESERVE BALANCE $827,009,000 Account 909A · 17 source rowsSALARIES AND WAGES - ONPAYROLL$165.70MSALARIES AND WAGES - ON PAYROLL $165,702,477 Account 0005 · 20 source rowsPROFESSIONAL AND TECHNICALSERVICES$105.36MPROFESSIONAL AND TECHNICAL SERVICES $105,355,280 Account 0140 · 20 source rowsREPAIR/MAINT EQUIPMENT$19.05MREPAIR/MAINT EQUIPMENT $19,052,451 Account 0162 · 5 source rowsOVERTIME$14.60MOVERTIME $14,602,857 Account 0020 · 10 source rowsMATERIAL AND SUPPLIES$11.26MMATERIAL AND SUPPLIES $11,255,640 Account 0340 · 7 source rowsRENTAL EQUIPMENT ANDSERVICES$5.60MRENTAL EQUIPMENT AND SERVICES $5,597,032 Account 0157 · 8 source rowsPURPOSES AS SPECIFIED$3.83MPURPOSES AS SPECIFIED $3,825,000 Account 9000 · 1 source rowSOFTWARE MAINTENANCE ANDLICENSING$2.80MSOFTWARE MAINTENANCE AND LICENSING $2,797,430 Account 0149 · 12 source rows{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"largest-appropriations","title":"Chicago Department of Transportation Top 10 Largest Appropriations, 2027 proposed","source":"Source: City of Chicago 2027 Budget Recommendations — Appropriations. Rows are grouped by appropriation account and ranked by amount.","warning":"","edited":false} Download data (CSV)

Because CDOT is so heavily grant-funded, local fund actuals paint a limited picture of departmental spend, but in 2025, the most recent complete budget year for which local fund actuals and encumbrances data is available, CDOT spent 92.3% of its locally-funded budget. 

Chicago Department of Transportation 2025 Actual Spend (Local Funds)

Chicago Department of Transportation 2025 Actual Spend (Local Funds)Chicago Department of Transportation stacked actual spending including encumbrances and unspent budget by appropriation category across the supplied local funds. Red segments highlight actual spending above the budgeted line.SPENDING CATEGORYBUDGETEDPERSONAL SERVICES$163,391,254$10,326,483 unspentPERSONAL SERVICES · 2025 $153,064,771 Chicago Department of Transportation · actual spend including encumbrances Budgeted: $163,391,254 Unspent: $10,326,483CONTRACT SERV - PRIOR APPR REQ$54,754,916$7,349,537 unspentCONTRACT SERV - PRIOR APPR REQ · 2025 $47,405,379 Chicago Department of Transportation · actual spend including encumbrances Budgeted: $54,754,916 Unspent: $7,349,537COMMODITIES - PRIOR APPR REQD$14,383,583$992,990 unspentCOMMODITIES - PRIOR APPR REQD · 2025 $13,390,593 Chicago Department of Transportation · actual spend including encumbrances Budgeted: $14,383,583 Unspent: $992,990CLAIMS - PAYMENTS & REFUNDS—Budget not suppliedCLAIMS - PAYMENTS & REFUNDS · 2025 $897,872 Chicago Department of Transportation · actual spend including encumbrances Budgeted: Not supplied Unspent: Not suppliedRETURNING CITIZENS INITIATIVES$600,000$0 unspentRETURNING CITIZENS INITIATIVES · 2025 $600,000 Chicago Department of Transportation · actual spend including encumbrances Budgeted: $600,000 Unspent: $0TRAVEL - PRIOR APPROVAL REQD$521,303$179,528 unspentTRAVEL - PRIOR APPROVAL REQD · 2025 $341,775 Chicago Department of Transportation · actual spend including encumbrances Budgeted: $521,303 Unspent: $179,528EQUIPMENT$238,415$56,640 unspentEQUIPMENT · 2025 $181,775 Chicago Department of Transportation · actual spend including encumbrances Budgeted: $238,415 Unspent: $56,640INTERNAL TRANSFERS AND REIMBURSEMENTS$49,760$8,092 unspentINTERNAL TRANSFERS AND REIMBURSEMENTS · 2025 $41,668 Chicago Department of Transportation · actual spend including encumbrances Budgeted: $49,760 Unspent: $8,092Actual spendUnspentBudgeted{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"actual-spend-categories","title":"Chicago Department of Transportation 2025 Actual Spend (Local Funds)","source":"Source: supplied 2025 FOIA response actuals.xlsx - formatted.csv. Actual spending includes encumbrances, by appropriation category, summed across the funds in the supplied local-funds extract.","warning":"","edited":false,"data":{"year":2025,"rows":[{"code":"0","label":"PERSONAL SERVICES","budget":163391254,"actuals":153064769,"encumbrances":2,"sourceVariance":10326483,"funds":["100","300","310","0B21"],"rowCount":4,"actualSpend":153064771,"unspent":10326483},{"code":"100","label":"CONTRACT SERV - PRIOR APPR REQ","budget":54754916,"actuals":46400610,"encumbrances":1004769,"sourceVariance":7349537,"funds":["100","300","310"],"rowCount":3,"actualSpend":47405379,"unspent":7349537},{"code":"300","label":"COMMODITIES - PRIOR APPR REQD","budget":14383583,"actuals":13010933,"encumbrances":379660,"sourceVariance":992990,"funds":["100","300","310"],"rowCount":3,"actualSpend":13390593,"unspent":992990},{"code":"989","label":"CLAIMS - PAYMENTS & REFUNDS","budget":null,"actuals":897872,"encumbrances":null,"sourceVariance":-897872,"funds":["0B46"],"rowCount":1,"actualSpend":897872,"unspent":null},{"code":"9142","label":"RETURNING CITIZENS INITIATIVES","budget":600000,"actuals":600000,"encumbrances":0,"sourceVariance":0,"funds":["100"],"rowCount":1,"actualSpend":600000,"unspent":0},{"code":"200","label":"TRAVEL - PRIOR APPROVAL REQD","budget":521303,"actuals":341776,"encumbrances":-1,"sourceVariance":179528,"funds":["100","300","310"],"rowCount":3,"actualSpend":341775,"unspent":179528},{"code":"400","label":"EQUIPMENT","budget":238415,"actuals":179781,"encumbrances":1994,"sourceVariance":56640,"funds":["100","300"],"rowCount":2,"actualSpend":181775,"unspent":56640},{"code":"9400","label":"INTERNAL TRANSFERS AND REIMBURSEMENTS","budget":49760,"actuals":24195,"encumbrances":17473,"sourceVariance":8092,"funds":["100","300"],"rowCount":2,"actualSpend":41668,"unspent":8092}],"rowCount":19}} Download data (CSV)

Change from Previous Year

Construction of buildings and structures, CDOT’s largest appropriations category, is up $154.6 million from the previous year’s budget, a 22.7% increase. 

A new $3.825 million appropriation from the EPA’s Diesel Emission Reduction Act federal grant is listed as being for “Purposes as Specified,” with no further information in the budget book or grants supplement. 

Outside contracting through the professional and technical services appropriation is also up $2.6 million, or 2.5%. 

The amount of grant funding held in reserve balance is down -$7.7 million, a -0.9% reduction from the previous year. 

Chicago Department of Transportation Net and Percent Appropriation Changes, 2026 to 2027 (proposed) Budgets

Chicago Department of Transportation net and percent appropriation changes, 2026 to 2027 proposed budgetsChanged appropriation accounts for Chicago Department of Transportation from the 2026 baseline to the 2027 proposed budget.APPROPRIATION20262027NET%CONSTRUCTION OF BUILDINGS AND …$681,218,229$835,847,807+$154,629,578+22.7%CONSTRUCTION OF BUILDINGS AND STRUCTURES +$154,629,578 $681,218,229 in 2026 · $835,847,807 in 2027 · +22.7%SALARIES AND WAGES - ON PAYROLL$158,018,939$165,702,477+$7,683,538+4.9%SALARIES AND WAGES - ON PAYROLL +$7,683,538 $158,018,939 in 2026 · $165,702,477 in 2027 · +4.9%PURPOSES AS SPECIFIED$0$3,825,000+$3,825,000—PURPOSES AS SPECIFIED +$3,825,000 $0 in 2026 · $3,825,000 in 2027 · —PROFESSIONAL AND TECHNICAL SER…$102,764,783$105,355,280+$2,590,497+2.5%PROFESSIONAL AND TECHNICAL SERVICES +$2,590,497 $102,764,783 in 2026 · $105,355,280 in 2027 · +2.5%REPAIR/MAINT EQUIPMENT$18,262,147$19,052,451+$790,304+4.3%REPAIR/MAINT EQUIPMENT +$790,304 $18,262,147 in 2026 · $19,052,451 in 2027 · +4.3%ENGINEERING AND ARCHITECTURE$2,182,909$2,282,565+$99,656+4.6%ENGINEERING AND ARCHITECTURE +$99,656 $2,182,909 in 2026 · $2,282,565 in 2027 · +4.6%DUES SUBSC & MEM$212,687$296,698+$84,011+39.5%DUES SUBSC & MEM +$84,011 $212,687 in 2026 · $296,698 in 2027 · +39.5%FRINGE BENEFITS$326,332$407,477+$81,145+24.9%FRINGE BENEFITS +$81,145 $326,332 in 2026 · $407,477 in 2027 · +24.9%SCHEDULE SALARY ADJUSTMENTS$463,838$506,657+$42,819+9.2%SCHEDULE SALARY ADJUSTMENTS +$42,819 $463,838 in 2026 · $506,657 in 2027 · +9.2%MATERIAL AND SUPPLIES$11,245,225$11,255,640+$10,415+0.1%MATERIAL AND SUPPLIES +$10,415 $11,245,225 in 2026 · $11,255,640 in 2027 · +0.1%CLOTHING$51,588$56,295+$4,707+9.1%CLOTHING +$4,707 $51,588 in 2026 · $56,295 in 2027 · +9.1%WASTE DISPOSAL SERVICES$120,957$122,757+$1,800+1.5%WASTE DISPOSAL SERVICES +$1,800 $120,957 in 2026 · $122,757 in 2027 · +1.5%REIMBURSEMENT - FFM$49,760$50,660+$900+1.8%REIMBURSEMENT - FFM +$900 $49,760 in 2026 · $50,660 in 2027 · +1.8%SALARY PROVISION$0$680+$680—SALARY PROVISION +$680 $0 in 2026 · $680 in 2027 · —RENTAL EQUIPMENT AND SERVICES$5,596,738$5,597,032+$294+0.0%RENTAL EQUIPMENT AND SERVICES +$294 $5,596,738 in 2026 · $5,597,032 in 2027 · +0.0%OFFICE CONVENIENCES$875$899+$24+2.7%OFFICE CONVENIENCES +$24 $875 in 2026 · $899 in 2027 · +2.7%STATIONERY AND OFFICE SUPPLIES$60,680$60,430-$250-0.4%STATIONERY AND OFFICE SUPPLIES -$250 $60,680 in 2026 · $60,430 in 2027 · -0.4%POSTAGE$16,965$10,915-$6,050-35.7%POSTAGE -$6,050 $16,965 in 2026 · $10,915 in 2027 · -35.7%ADVERTISING$572,323$564,068-$8,255-1.4%ADVERTISING -$8,255 $572,323 in 2026 · $564,068 in 2027 · -1.4%MOBILE COMMUNICATION SERVICES$48,005$38,505-$9,500-19.8%MOBILE COMMUNICATION SERVICES -$9,500 $48,005 in 2026 · $38,505 in 2027 · -19.8%PURCHASE - IT HARDWARE$144,385$133,724-$10,661-7.4%PURCHASE - IT HARDWARE -$10,661 $144,385 in 2026 · $133,724 in 2027 · -7.4%TECHNICAL MEETING COSTS$45,613$34,488-$11,125-24.4%TECHNICAL MEETING COSTS -$11,125 $45,613 in 2026 · $34,488 in 2027 · -24.4%TRANSPORTATION AND EXPENSE ALL…$482,148$468,708-$13,440-2.8%TRANSPORTATION AND EXPENSE ALLOWANCE -$13,440 $482,148 in 2026 · $468,708 in 2027 · -2.8%PAINTS AND PAINTING SUPPLIES$34,000$19,226-$14,774-43.5%PAINTS AND PAINTING SUPPLIES -$14,774 $34,000 in 2026 · $19,226 in 2027 · -43.5%REIMBURSEMENT TO TRAVELERS$45,179$30,152-$15,027-33.3%REIMBURSEMENT TO TRAVELERS -$15,027 $45,179 in 2026 · $30,152 in 2027 · -33.3%OVERTIME$14,623,446$14,602,857-$20,589-0.1%OVERTIME -$20,589 $14,623,446 in 2026 · $14,602,857 in 2027 · -0.1%SOFTWARE MAINTENANCE AND LICEN…$3,053,432$2,797,430-$256,002-8.4%SOFTWARE MAINTENANCE AND LICENSING -$256,002 $3,053,432 in 2026 · $2,797,430 in 2027 · -8.4%CONTRACT WAGE - PREVAILING RATE$1,881,967$0-$1,881,967-100.0%CONTRACT WAGE - PREVAILING RATE -$1,881,967 $1,881,967 in 2026 · $0 in 2027 · -100.0%RESERVE BALANCE$834,736,000$827,009,000-$7,727,000-0.9%RESERVE BALANCE -$7,727,000 $834,736,000 in 2026 · $827,009,000 in 2027 · -0.9%{"schemaVersion":1,"department":"Chicago Department of Transportation","departmentCode":"84","cycle":"2027-prep","budgetYear":2027,"exportedAt":"2026-10-28T15:21:18.094Z","id":"appropriation-changes","title":"Chicago Department of Transportation Net and Percent Appropriation Changes, 2026 to 2027 (proposed) Budgets","source":"Source: City of Chicago 2026 Budget Ordinance and 2027 Budget Recommendations appropriations datasets. Percent change is net change divided by 2026 budgeted appropriation.","warning":"","edited":false} Download data (CSV)